In the Middle East’s fast-growing industrial sectors—oil & gas, petrochemical, automotive, and aerospace—Non-Destructive Testing (NDT) is critical for safety and compliance. Magnetic Particle Inspection (MPI) stands out as the go-to method for detecting surface and near-surface defects in ferromagnetic materials.

Chinese manufacturers like NK NDT are now the preferred NDT equipment suppliers in the Middle East, delivering high-performance MPI machines from China at 30–50% lower costs than European or U.S. brands.
Why Choose Chinese MPI Equipment?
- High Quality & Reliability: PLC control, solid-state power, high-sensitivity UV systems.
- Fully Customized: Tailored for part size, current, speed, and regional standards.
- Competitive Pricing: Same functionality, 30–50% cost savings.
- Comprehensive Support: Online training, spare parts, on-site service.
Cost Comparison: China vs. Europe/U.S.
| Feature | China (NK NDT) | Europe/U.S. |
|---|---|---|
| Bench-type MPI | $8,000–$12,000 | $18,000–$25,000 |
| Automatic Inspection Line | $45,000–$80,000 | $120,000+ |
| After-sales (1st year) | Free remote + parts | Paid contract |
Key Applications in the Middle East
- Oil & Gas: Pipes, valves, welds
- Automotive: Crankshafts, axles
- Aerospace: Turbine blades, landing gear
- Shipbuilding: Welded hull structures

Detects cracks, seams, laps, and inclusions with fluorescent particles under UV light.
NK NDT: Your Trusted MPI Partner
NK NDT offers:
- Bench-type MPI machines (500A–6000A)
- Portable & mobile units
- Fully automatic inspection lines
- UV lamps, magnetic inks, demagnetizers
All systems comply with ASTM E1444, ISO 9934, and EN 1290.
Successful Projects in the Region
- Saudi Aramco – 5 automatic MPI lines (2023)
- UAE shipyard – 12 bench units (2024)
- Egyptian petrochemical plant – FPI+MPI combo (2025)
Get a Free Quote Today
Looking for a reliable NDT equipment supplier in the Middle East? Contact NK NDT for customized MPI solutions from China.
FAQ
What is the lead time for MPI machines?
Standard bench: 8–10 weeks | Automatic line: 10–12 weeks
Do you provide ISO 90001
Sure





